Geothermal · Geothermal Projects, Studies & Spare PartsAccepting quotesintegration of geothermal resources with heat power plant
- Country
- 🇸🇰 Slovakia, Košice Region
- Quote deadline
- 08 Jul 2025 · Expired
- Quantity
- —
- Received quotes
- 0 quotes · 3 views
Description
The project is divided into 3 main phases: 1️⃣ Košice Teplárne - Point L1: 0.8 km length of double DN500 steel insulated pipe Part of the pipes in above-ground steel carriers Disassembly, installation of new equipment, electro and control system integration 2️⃣ L1 - Olšovany - Svinica - Ďurkov: 12.5 km DN500 pipeline (L1 - Olšovany) 2.8 km connection line (DN400 and DN350 diameters) Covers a total of 7 cadastral areas Various soil types (urban area, agricultural land, stream crossings) 3️⃣ Geothermal Centre (Svinica - Ďurkov): Construction of heat exchange station 6 special heat exchangers Pump, ventilation, indoor electrical and mechanical systems MaR and SCADA integration