Enerji DepolamaTeklif alıyorBattery Energy Storage Systems
- Ülke
- 🇬🇧 Birleşik Krallık, Highland
- Son teklif tarihi
- 26 May 2026 · Süresi doldu
- Miktar
- —
- Gelen teklifler
- 0 teklif · 4 görüntülenme
Açıklama
A region is looking for a specific developer to develop a Battery Energy Storage System (BESS). Project Features: Installation capacity: 9,900 kVA import / 9,900 kW export Grid connection: 33kV overhead line (Scottish Hydro Electric Power Distribution PLC) Connection date (expected): October 31, 2027 Build-Operate model: The developer will be responsible for design, construction, and operation Lease term: 20–40 years + revenue sharing and option fee payment

