Rüzgar EnerjisiTeklif alıyorConstruction of the Offshore Grid Connection of the Baltica 1 Wind Farm
- Ülke
- 🇵🇱 Polonya, West Pomeranian Voivodeship
- Son teklif tarihi
- 11 Ağu 2025 · Süresi doldu
- Miktar
- —
- Gelen teklifler
- 0 teklif · 4 görüntülenme
Açıklama
1. FEED Document Preparation (Front-End Engineering Design) Develop technical solutions for transmitting electricity from the wind farm to shore Perform preliminary engineering analyses of submarine cable routes and onshore connection points 2. Technical Procurement Documentation Will create technical specifications and tender documents for the procurement of materials and services Will provide technical definitions for grid connections, subsea cables, transformer stations, etc. 3. Land Use Rights (Expropriation Process) Will regulate legal permits and usage rights in construction areas Will follow up on the necessary permit documents and authorizations 4. (Optional) Construction Projects and Permits Final construction projects will be prepared based on the FEED study. Applications will be made to obtain construction permits. This process can be carried out separately for both the land and sea sections. Translated with DeepL.com (free version)

