Installation of photovoltaic (solar panel) systems
122
Days Left
Request Start Date
26.06.2025
Request End Date
03.06.2026
Spain
Description
<p>Roof-mounted PV systems on 6 buildings PV canopies (marquesinas) in
4 parking lots + 1 pedestrian area Ground-mounted PV fields in 3 different campus areas BESS installation in 2 areas Low-voltage battery systems (SLB) in 2 buildings Connection to the medium-voltage campus network 5 years of maintenance service for all systems</p>